[LISTATTENDEES event_identifier=”ep32-scope-creep-april-29-2013-5-517dbf3fedf79″ show_gravatar=”true”]
WPwatercooler
EP32 – Scope Creep – WPwatercooler – April 29 2013
Today’s topic is our good friend Scope Creep. Scope Creep (also called requirement creep) in project management refers to uncontrolled changes or continuous growth in a project’s scope. We will be discussing techniques on making sure a project is properly defined, documented, or controlled.
Panel
- Chris Conrey
- Chris Lema
- Dave Jesch
- Dustin Filippini
- Greg Taylor
- Jason Tucker
- Reid Peifer
- Sé Reed
- Steve Zehngut
- Wes Chyrchel
Episode Transcription
No Transcription
3 responses to “EP32 – Scope Creep – WPwatercooler – April 29 2013”
-
Very cool. Scope creep is the bane of every IT professional’s existence. Good chat.
-
I enjoyed this discussion. Lot’s of really great points. I especially liked the point about working collaboratively with the client. Good Job..
-
@ 24:20 Se talks about the client not having any access or have lost the ownership of their domain. In order to get access, workout access issues or get the domain back, I am assuming the time spent for that should be billable or should it be part of customer service/help?
Leave a Reply